Grenergy signs Peru's largest renewable PPA: 900 GWh a year for 15 years
Grenergy signed a solar PPA in Peru for 900 GWh a year over 15 years with an investment-grade utility; supply from Macarena and Locumba begins in 2029.

Grenergy signed a power purchase agreement (PPA) on November 24, 2026 for close to 900 GWh a year over 15 years with an investment-grade Peruvian utility, a deal the Spanish company presents as the largest renewable energy agreement signed in Peru to date. Supply will begin in 2029.
The energy will come from two photovoltaic plants in the south of the country: Macarena, 209 MW in Ica, and Locumba, 241 MW in Tacna, which together total 450 MW and an estimated combined output of more than 1.1 TWh a year. The contracted volume equals about 80% of that generation, as reported by Infobae. Neither the counterparty nor the economic terms were disclosed. For generators in Mexico, which outside public auctions turn to long-term bilateral contracts, the reference point is the structure: an investment-grade buyer that absorbs close to 80% of output and underpins the financing of two plants.
Grenergy has operated in Peru since 2015 and has developed the Duna Huambos wind farm and the Matarani plant, of about 100 MW, both later sold to third parties; in 2023 it signed a 15-year PPA for 2.7 TWh with Enel Generación Perú for that asset. The operation is joined by the Pacific Oasis hybrid platform, which the company plans with 1 GW of solar and 3.1 GWh of batteries, according to PV Tech. The firm is replicating the model of its Oasis platforms in Chile, among them Oasis de Atacama, with 2 GW of solar and 11 GWh of storage. In Peru it obtained environmental approval this year for Cotahuasi I, a 200 MW project with up to 144 MWh of batteries in Arequipa.
What comes next is financial close and the construction permits for Macarena and Locumba. The definitive generation concession for Locumba covers 200 MW nominal, below the 241 MW announced in the PPA, a point to watch in the regulatory file. The market will be watching whether the contracting structure is replicated in other countries in the region.
This article was written with the assistance of artificial intelligence from verified sources and reviewed by a human editor before publication.
Sources
Related stories
This article was drafted with AI assistance from verified sources and reviewed by a human editor before publication.
← All news